Update on the 2019 tunnel collapse and canal washout
In the months following the collapse of Tunnel No. 2 on the Goshen/Gering-Fort Laramie main canal in July 2019, temporary repairs were made to Tunnels No 1 and 2. Steel ribs were installed inside